Tuesday, June 21, 2016

A work in progress.

Improvements to 2900:

Exterior:
     All brush cleared from South, East, and North sides of the building
     Dead tree removed from front of building
     Exterior security lighting replaced
     Prepared outside of building for painting
     Scraped all old paint
     Caulked where needed
     Outside of building/deck painted
     White gravel removed from flower beds in parking lot

Interior:
     Electrical
     Electrical panel replaced
     Replaced wiring to outlets upstairs/downstairs
     Replaced wiring to lights upstairs/downstairs
     Fluorescent bulbs replaced upstairs/downstairs
     Vivint security system installed
     Plumbing
     All plumbing replaced
     Upstairs and downstairs toilets replaced
     (2) Sinks downstairs installed
     Remodeling
     Old carpeting removed
     Removal of all construction debris from upstairs/downstairs
     Prepared subflooring for new flooring
     New flooring installed
     Interior painting
     Interior walls prepared for painting upstairs/downstairs
     Application of primer
     Caulking where needed
     Removal of stairs/stairway
     Reinstalled all doors
     HVAC
     Replaced 1 of 2 AC units
     Refurbished 1 of 2 AC units
     Professionally cleaned air ducts

     Filters replaced