Improvements to 2900:

Exterior:
●     All brush cleared from South, East, and North sides of the building
●     Dead tree removed from front of building
●     Exterior security lighting replaced
●     Prepared outside of building for painting
○     Scraped all old paint
○     Caulked where needed
●     Outside of building/deck painted
●     White gravel removed from flower beds in parking lot

Interior:
●     Electrical
○     Electrical panel replaced
○     Replaced wiring to outlets upstairs/downstairs
○     Replaced wiring to lights upstairs/downstairs
○     Fluorescent bulbs replaced upstairs/downstairs
○     Vivint security system installed
●     Plumbing
○     All plumbing replaced
○     Upstairs and downstairs toilets replaced
○     (2) Sinks downstairs installed
●     Remodeling
○     Old carpeting removed
○     Removal of all construction debris from upstairs/downstairs
○     Prepared subflooring for new flooring
○     New flooring installed
○     Interior painting
○     Interior walls prepared for painting upstairs/downstairs
■     Application of primer
■     Caulking where needed
○     Removal of stairs/stairway
○     Reinstalled all doors
●     HVAC
○     Replaced 1 of 2 AC units
○     Refurbished 1 of 2 AC units
○     Professionally cleaned air ducts

○     Filters replaced